Building code.

Beauty starts with proportion, and in the UAE proportion starts with the code — but there is no single UAE stair code. The numbers that govern your staircase depend on who issues the building permit for your plot. A riser that passes on Yas Island fails in Dubai Hills; a flight that is legal in Emirates Hills needs a landing on the Palm. This page keeps the three regimes separate, so that the number you read is the number your Authority checks.

Start here · Three regimes

Where is the project? That decides the rulebook.

Jump straight to the regime for your plot. Not sure which applies? The authority matrix maps the common communities.

What is shared across all three

The UAE Fire & Life Safety Code — including the laminated-glass rule for structural balustrades — applies in every emirate. So do the two measurement conventions that decide most assessments. Those live in the Everywhere section directly below, before the regime-specific numbers begin.

Every emirate · every regime

The rules that follow you everywhere.

AppliesAll three regimes — Dubai mainland, Trakhees zones, Abu Dhabi
Fire authorityDubai Civil Defence · Abu Dhabi Civil Defence
Governing textUAE Fire & Life Safety Code + measurement conventions of each code
Figure U·01 · How the numbers are measured

Two conventions decide more assessments than any single limit.

The limits differ between regimes; the way they are measured does not. Both conventions below have decided real CAworks assessments — a stair that "clearly passed" on the drawing failed once measured the way the code measures.

  • Headroom is measured from the nosing line — a plane parallel to the most forward projection of the treads — not from the tread surface to the soffit. Tread-to-soffit overstates headroom by up to one full riser where a beam crosses mid-tread. Dubai requires 2 300 mm above that plane, Trakhees 2 400 mm, Abu Dhabi 2 032 mm — different values, same plane. DBC K.5.5.2.10 · Fig K.34 · ADIBC 1009.2
  • Clear width is measured between the guards. Guards must not encroach on the required clear width of the stairway, so stringer channels and balustrade glass sit outside the 1 000 mm — a "1 000 mm tread" with 37 mm channels each side is a 926 mm stair. Handrails alone may project up to 100 mm per side at 865–965 mm height. The fix that costs no footprint: fix the guard outboard of the walking surface, so the tread width is the clear width. DBC K.5.5.2.2 · K.5.5.2.6 · Fig K.24
Figure U·02 · Glass in guards & balustrades

One material rule, every emirate.

Whatever the geometry regime, the glass itself answers to the UAE Fire & Life Safety Code — enforced by Dubai Civil Defence in Dubai and Abu Dhabi Civil Defence in Abu Dhabi. Within DBC Part K projects, clauses K.5.2.5.2 and K.7.6 carry the same requirement under the DBC's own numbering.

Material specification
  • Glass in structural balustradesLaminated safety glass
  • Permitted build-upsLam. fully-tempered · lam. heat-strengthened
  • Post-breakage integrityRequired
  • Impact classificationEN 12600

UAE FLSC §2.17.6

Structure
  • Guard assembly loadsASCE/SEI 7-16
  • Adopted byDBC K.8.4
  • CAworks cross-checkBS 6180
  • Monolithic toughened aloneNot accepted

DBC K.5.2.5.2 · K.8.4

Why glass must be laminated, not just toughened

Toughened (tempered) glass is strong, but when it breaks it breaks completely — turning into thousands of small dice at once. Laminated glass is two or more sheets bonded by a polymer interlayer, so if one ply fails the interlayer holds the fragments and the panel keeps residual load capacity until replacement. The UAE FLSC requires this in any structural balustrade for exactly that reason — a barrier that could vanish on impact is not a barrier.

Figure U·03 · The comfort formula

2R + G — the Blondel relationship, and where each bound applies.

A 350-year-old proportion rule that hasn't been improved on. The average adult stride doesn't change between Paris in 1672 and Dubai in 2026 — but the three UAE regimes treat the formula differently, so the bound has to be quoted with its regime.

Trakhees — normal staircases
  • Target sum2R + T = 620 mm

Trakhees §13.1.6

DUDC — accessible routes
  • Minimum sum> 650 mm
  • Maximum sum< 700 mm

DUDC §5.8.1 cl.3

DBC Part K — Dubai villas
  • 2R + G ruleNone
  • At Part K limits (180 / 280)2×180 + 280 = 640 mm

DBC Part K §K.5.5.2.3

An honest note: the two bands conflict

A stair built exactly to the Trakhees 620 mm target sits below the DUDC's 650–700 mm accessibility band. Where the DUDC applies — accessible routes, public and common-area stairs — the DUDC wins. Where it doesn't — a private villa under DBC Part K — there is no 2R + G test at all. The formula remains the best sanity check an architect has:

• 2×165 + 300 = 630 mm — brisk, tight
• 2×160 + 320 = 640 mm — household sweet spot
• 2×150 + 350 = 650 mm — grand entrance, generous

Figure U·04 · Accessibility overlays

The overlay codes — and exactly where they bite.

Dubai layers the Dubai Universal Design Code over its building codes; Abu Dhabi runs its own International Accessibility Standards. Both apply to accessible routes — public and common-area circulation — and win where stricter. They do not rewrite the rules inside a private villa.

DUDC handrails — position
  • Mounting height900 mm
  • Second rail (children)650–750 mm
  • Both sides if Δlevel > 500 mmRequired
  • Extension top & bottom≥ 300 mm
  • Intermediate rail if width > 2 100 mmRequired

DUDC §5.9

DUDC handrails — grip
  • Circular profileØ 30–40 mm
  • Elliptical profile50 × 40 mm
  • Clearance to wall30–60 mm
  • Underside support clearance≥ 50 mm
  • Reflectance contrast≥ 30 LRV

DUDC §5.9

  • No open risers, no discontinued treads, curved stairs to be avoided — on accessible routes. DUDC §5.8 prohibits open risers and discourages curved flights where the route must be accessible. DBC Part K expressly permits open, spiral and winder stairs in villas (K.5.5.2.1), subject to the 100 mm sphere principle. Floating open-riser and helical stairs are our core product: in a private villa the DUDC prohibition does not apply to them; in a hotel lobby or a common-area stair, it can. We state which regime governs on every drawing. DUDC §5.8 · DBC K.5.5.2.1
  • Illumination ≥ 200 lux at the top, the bottom and along the flight. Pendant fittings over voids count toward this; LED tread strips supplement but rarely meet it alone. Checked at handover with a calibrated lux meter. DUDC §5.8
  • Step-edge contrast ≥ 30 LRV points over the first 30 mm of the nosing — the tread edge must visually distinguish itself from the tread face. On stone or concrete this is a contrasting inlay or sandblast stripe. DUDC §5.8
  • Slip resistance — PTV ≥ 36 dry; ≥ 36 wet (external). The Pendulum Test Value benchmark from BS 7976; Dubai Municipality accepts it as the working standard for stairs. Brushed steel, honed natural stone and sandblasted glass treads all comfortably exceed it. BS 7976 · DM guidance
  • Abu Dhabi runs its own accessibility standard — the Abu Dhabi International Accessibility Standards (ICC A117.1-based), applied by DMT on accessible routes. Do not quote DUDC values on an Abu Dhabi drawing. AD Accessibility Standards
Regime I · Dubai mainland

Dubai villas — DBC 2021, Part K.

AuthorityDubai Municipality (BPS) · Dubai Development Authority in its districts
CodeDubai Building Code 2021 — Part K, standalone for detached villas & townhouses ≤ 3 storeys
WhereMainland Dubai — Jumeirah, Emirates Hills, Dubai Hills, Arabian Ranches, Meraas districts, Nakheel mainland communities

Part K is the rulebook for the private villa staircase — and it is more permissive on flights and more demanding on step geometry than most published summaries suggest. Non-villa buildings under DM or DDA run on the DBC's general parts, where several limits differ — the high-rise block at the end of this section covers the duplex-apartment case, worked clause by clause.

Figure K·01 · Step geometry

Rise, going and width — the numbers the Authority checks first.

Set these first; flight length, landing position and headroom all follow.

Riser & going
  • Riser height100–180 mm
  • Tread depth (going)≥ 280 mm
  • Tread slope≤ 2 %
  • Uniformity within a flight≤ 10 mm

DBC Part K §K.5.5.2.3

Clear width
  • All stairways≥ 1 000 mm clear
  • MeasuredBetween the guards
  • Guard encroachmentNot permitted
  • Handrail projection≤ 100 mm per side

DBC Part K §K.5.5.2.2 · Fig K.24

If you have seen "riser 200 / going 240" — that was the old rule

The pre-DBC Dubai Municipality villa circular allowed a 200 mm riser on a 240 mm going, and the figure still circulates in older references. It has not been the rule since Decree 45 of 2021 enacted the DBC. A 184 mm riser passes the old number and fails Part K by 4 mm — we have assessed exactly that stair. Design to 100–180 / ≥ 280.

Figure K·02 · Flights & landings

Part K's most misunderstood clause: no landing is required.

The DBC defines a flight as a continuous run of treads from one landing to another — and then, for villas, declines to force a landing at any height.

Flights
  • Intermediate landingNot required at any rise
  • RecommendedWhere rise > 4 m
  • Steps per flightNo cap
  • One flight= landing to landing

DBC Part K §K.5.5.2.4

Landings
  • Width≥ 1 000 mm
  • Length — straight runNeed not exceed 1 000 mm
  • Slope≤ 2 %
  • Door swingMay encroach ≤ half the landing

DBC Part K §K.5.5.2.4 · Fig K.27

No 14-step rule on the mainland

The 14-step-per-flight limit belongs to Trakhees plots, not to Part K. A typical villa floor-to-floor of 3.3–3.6 m needs 19–21 risers at comfortable heights — under Part K that is one continuous flight, fully compliant, no landing. The same stair on the Palm needs a landing. This single difference reshapes the design more than any other clause, and it is exactly why the two regimes are kept separate on this page.

Figure K·03 · Headroom

2 300 mm above the nosing line.

Measured vertically above a plane parallel to the most forward projection of the treads — see the measurement conventions. Tread-to-soffit is not the code measurement.

Straight & winder stairs≥ 2 300 mm Above the nosing plane, full flight and landings. K.5.5.2.10 · Fig K.34.
Curved stairs≥ 2 300 mm A sweeping descent leans the body toward the outer arc, projecting the head forward.
Spiral stairs≥ 2 030 mm The body hugs the centre column; the head tracks a tight circle.

The beam rule of thumb

For a soffit or beam at height H above the lower floor, the nosing plane clears 2 300 mm only up to a nosing height of H − 2 300. Locate the obstruction's leading face against the nosing line in the 3D model and measure there — a beam crossing mid-tread can eat up to one riser of apparent clearance.

Figure K·04 · Spiral, curved & winder stairs

Geometry gets harder the moment the stair stops being straight.

When treads are wedge-shaped, every rule about "going" has to specify where on the tread you measure. The diagrams are reproduced from DBC 2021 Part K, Figure K.31. If the stair has any straight run, the winder column governs — not the spiral or curved one.

Curved Curved stair plan — Dubai Building Code Figure K.31 ≥ 255 mm at 305 mm from narrowest edge measured along the walking line
Spiral Spiral stair plan — Dubai Building Code Figure K.31 ≥ 190 mm at 305 mm from narrower edge measured along the walking line
Winders Winder stair plan — Dubai Building Code Figure K.31 ≥ 150 mm at narrowest, ≥ 280 mm at 305 mm measured along the walking line
Curved · §K.5.5.2.8
  • Clear width≥ 1 000 mm
  • Tread at 305 mm point≥ 255 mm
  • Riser — wholly curved flight≤ 240 mm
  • Headroom≥ 2 300 mm
  • Outer handrailRight of descent

DBC Part K §K.5.5.2.8

Spiral · §K.5.5.2.8
  • Clear width≥ 1 000 mm
  • Tread at 305 mm point≥ 190 mm
  • Riser — wholly spiral flight≤ 240 mm
  • Headroom≥ 2 030 mm
  • As main villa stairNot recommended

DBC Part K §K.5.5.2.8

Winders · §K.5.5.2.8(i)
  • Clear width≥ 1 000 mm
  • Tread at narrowest≥ 150 mm
  • Tread at 305 mm point≥ 280 mm
  • Riser — straight runs present≤ 180 mm
  • Walking-line going= straight going ± 10 mm

DBC Part K §K.5.5.2.8(i)

Why the 305 mm rule exists — and the trap overseas suppliers fall into

On a wedge tread no single "depth" exists, so the code measures it at a fixed point 305 mm in from the narrower edge — where a real foot lands. The line connecting those points is the walking line, and every tread must satisfy the minimum along it.

The 240 mm riser allowance belongs to wholly spiral or curved flights only. The moment a straight run exists, the stair is a winder stair: the 180 mm cap of K.5.5.2.3 applies, and because a stair with no landing is one flight, the 10 mm uniformity rule carries that cap — and the straight going — through the turn. Winder treads whose walking-line going doesn't match the straight going are the single most common defect we find on overseas supplier drawings.

Clause (h) — outer handrail on the right of a descending user — reflects right-hand dominance: descending, a right-handed person reaches for the rail on their right, so handrail placement on a curved stair is always specified by descent direction.

Figure K·05 · Handrails

What you actually hold — the DBC's own dimensions.

The interface between the stair and the human body. Compliance failures here are the most common reason a snag-list is rejected at handover.

Position
  • Height above nosing865–965 mm
  • As part of a guard — up to1 065 mm
  • Continuous, full flightRequired
  • Extension top & bottomOne tread depth, returned to wall
  • Wall clearance≥ 57 mm

DBC Part K §K.5.5.2.5 · Fig K.28

Grip geometry
  • Circular profileØ 32–51 mm
  • Other profiles — perimeter100–160 mm
  • Largest cross-section≤ 57 mm
  • Edge radius≥ 3.2 mm

DBC Part K §K.5.5.2.5 · Fig K.29

One rail or two — the 1 065 mm window

A single top rail serving as both handrail and guard on a flight must sit at exactly 1 065 mm above the nosing — the maximum K.5.5.2.5 allows a handrail forming part of a guard, and the minimum K.5.5.2.6 allows the guard in that case. Glass at 1 200 mm with a cap rail is a compliant guard whose rail is not a compliant handrail — a separate graspable rail at 865–965 mm is then required on each open side.

The spec-safe window: a circular rail of Ø 32–40 mm mounted at 900 mm satisfies both the DBC and the DUDC — the profile range where the two codes overlap. Note the DUDC's Ø 30 lower bound fails the DBC's Ø 32 minimum: specify from the overlap, not from either code alone.

Figure K·06 · Guards & balustrades

The vertical barrier that stops a fall.

A guard is not a handrail. The handrail is what you hold; the guard is the wall of protection between the stair edge and the void. The DBC measures height, climbability and material independently — and the Dubai numbers are higher than most international references.

Heights
  • Required where drop> 760 mm
  • Stair flights≥ 1 200 mm
  • Where handrail tops the guard1 065 mm permitted
  • Landings · wellheads · balconies≥ 1 200 mm

DBC §K.5.5.2.6 · §K.5.2.5.2

Openings & climbability
  • Sphere test up to 865 mmØ 100 mm cannot pass
  • Horizontal climbable elements < 865 mmNone
  • Bottom gap≤ 100 mm
  • Riser–tread–guard triangleØ 150 mm sphere

DBC §K.5.2.5.2 · Fig K.11

Structure & glass
  • Assembly loadsASCE/SEI 7-16
  • GlassLaminated — holds if shattered
  • Encroachment on clear widthNot permitted

DBC §K.5.2.5.2 · §K.8.4

760 and 865 are different numbers

760 mm is the trigger: any elevated surface more than 760 mm above the adjacent level must have a guard at all. 865 mm is the climb-resistant zone: no horizontal climbable elements within 865 mm of the walking surface, and open guards must reject the 100 mm sphere up to that height. Conflate the two and you design the wrong barrier.

Figure K·07 · Open risers & tread surfaces

The clauses that make the floating staircase legal.

Part K is explicit about the stair typologies it permits — which matters, because the accessibility overlay prohibits some of them on public routes.

  • Open risers, spiral stairs and winders are expressly permitted in villas for all uses other than access to or exit from a basement — basement escape stairs must be enclosed with 1 000 mm clear width. DBC Part K §K.5.5.2.1
  • The open-riser gap is riser minus tread thickness, judged against the 100 mm sphere. At the 180 mm maximum riser, a tread of 80 mm or more keeps the gap compliant — and we flag anything within a few millimetres of the limit, because a later riser change silently re-opens the gap. DBC §K.5.2.5.2
  • Treads and landings must be free of projections or lips that could trip, with consistent surface traction. Part K sets no numeric nosing cap — we detail a consistent projection of ≤ 25 mm as the acceptance value and never mix overlaps within a flight. DBC Part K §K.5.5.2.9
Figure K·08 · External stairs above ground level

The 11 m rule.

One of the more visually-restrictive clauses in the code — often missed at concept stage and expensive to correct.

  • External stairs more than 11 m above finished ground level must be enclosed on the open side by an opaque visual obstruction not less than 1 200 mm in height. Frameless clear-glass balustrades fail this clause; the design needs an opaque infill, a solid parapet, or a fritted / ceramic-coated glass the Authority accepts as visually opaque. The rule prevents vertigo-induced misstep on long external climbs. DBC Part K §K.5.5.2.7
Section A · Alternative solutions

When the existing void cannot fit a compliant stair.

Renovations meet this constantly: the stair opening was cast for the old rules. The DBC has a formal route for it.

  • DBC A.8 permits performance-based alternative solutions for projects that cannot reasonably meet the prescribed requirements, and for changes to existing buildings where full compliance would cost disproportionately. The consultant demonstrates equivalence; the Authority decides. We prepare the geometry and comparable-standard evidence that argument needs — it is a documented, workable path, not a loophole. DBC §A.8
  • A.7 exempts designs finally approved before the DBC — but a replacement staircase is a change to the existing building, assessed under A.8(b). The old approval covers the old stair, not its successor. DBC §A.7
Section B · High-rise & apartment stairs

Beyond Part K — the duplex stair in a tower.

A stair inside a duplex apartment is not a villa stair. Part K's scope stops at detached villas and townhouses of up to three storeys (K.4); in a tower, the unit fit-out is a "Modification" under Table A.1 and the stair runs on the DBC's general parts — Part B for geometry and guards, Part E for the glass — plus DDA Circular 239 in DDA districts such as Dubai Hills. The numbers that change are the ones that hurt: width and landings.

Stair geometry · Part B
  • Clear width — all stairways≥ 1 200 mm
  • Riser / tread100–180 / ≥ 280 mm
  • Rise between landings≤ 3 660 mm
  • Headroom — nosing plane / landings2 030 / 2 300 mm
  • Winders, spiral, curved (non-exit stair)Permitted

DBC §B.6.4.1.3–.5 · .12 · .15

Handrails & guards
  • Handrails — both sides865–965 mm
  • Second rail — regular-use stairs650–750 mm
  • Guards — stair & slab opening≥ 1 200 mm
  • As handrail-topped guard1 065 mm
  • DDA C239 vs DBCDesign to the stricter

DBC §B.6.4.1.7–.8 · §B.4.2.5.2 · DDA C239

Glass · Part E
  • FLSC §2.17 / §5.4.2–.4Superseded — cite the DBC
  • Containment where drop > 760Required (E.9.2)
  • Impact classificationEN 12600 · Table E.9
  • Manifestation where walk-into risk750–1 500 mm AFL

DBC §E.9 · §E.10.1

What changes against a villa stair

Four things, and all four reshape the design: the stair is 1 200 mm wide, not 1 000; a landing is forced every 3 660 mm of rise — the open-ended Part K flight is gone; handrails go on both sides; and the DDA's own guardrail circular sits on top, matching the DBC everywhere except the climb-free zone — 760 there, 865 in the DBC, so 865 governs. Loads run to ASCE/SEI 7-16, which already contains C239's 0.89 kN point load. Floating typologies survive the move: winders, spiral and curved stairs remain permitted in a stair that is not an exit stair.

Worked example — duplex stair in a DDA high-rise The full 20-clause regulation register for a Dubai Hills tower duplex: DBC Parts A, B and E with the code pages reproduced, DDA Circular 239, and the design-to-stricter reconciliation. 18 pages, prepared by CAworks.
↓ Download the register · PDF
Regime II · Trakhees zones

Palm, JAFZA & Dubai South — Blue Code §13.

AuthorityTrakhees CED — the engineering arm of the Ports, Customs & Free Zone Corporation (PCFC)
CodeTrakhees Building Regulation & Design Guidelines ("Blue Code") — §13 Vertical Circulation
WherePalm Jumeirah · JAFZA · Dubai South / DWC · the ports and other PCFC areas

Trakhees writes its own stair clauses and also adopts the DBC — the reviewing engineer may apply either or both. Where both could apply, we assess against both and report the stricter. The headline differences from the mainland: a 14-step flight cap, 2.4 m headroom, and a tighter riser.

Figure T·01 · Step geometry

Rise & going — internal and external treated separately.

Shoes, weather and the heel-strike angle of a descent are not the same outdoors, so the Blue Code splits the two.

Blue Code Fig-40 · redrawn TREAD ≥ 270RISER ≤ 175NOSING ≥ 302R + T = 620 MMALL STEPS IDENTICALIN HEIGHT & WIDTH · §13.1.4 Riser ≤ 175 · tread ≥ 270 · nosing ≥ 30 Normal internal staircase, redrawn from the Blue Code Fig-40 · §13.1.6
Internal stairs
  • Riser (max)≤ 175 mm
  • Tread (min)≥ 270 mm
  • Comfort target2R + T = 620 mm
  • Nosing overhang (Fig-40)≥ 30 mm
  • All steps identicalHeight & width

Trakhees §13.1.6 · §13.1.4

External stairs
  • Riser (max)≤ 165 mm
  • Riser (preferred)150 mm
  • Tread (min)≥ 280 mm
  • Tread (preferred)350 mm

Trakhees §13.1.7

On the "recommended 150–165 / 300–340" band: those values are DUDC accessible-route guidance, not Blue Code text — see the accessibility overlays. They sit comfortably inside the Trakhees window, which is why most architects specify within them without thinking.

Figure T·02 · Flights & landings

The 14-step rule lives here.

Long uninterrupted climbs are tiring and dangerous; on Trakhees plots the code forces a rest point at a fixed interval — the clause mainland Dubai villas do not have.

Blue Code Fig-39 · redrawn NEXT FLIGHT · ≤ 14MAXIMUM 14 STEPS IN ONE DIRECTION · §13.1.5LANDING ≥ 1 100RESIDENTIAL & OFFICE · 1 500 PUBLIC Maximum 14 steps in one direction, then a landing Main staircase rule, redrawn after the Blue Code Fig-39 · §13.1.5
Flights
  • Main staircase — steps per flight / direction≤ 14
  • Fire-escape stairs — consecutive steps≤ 20
  • Fire-escape — min steps, same direction≥ 3
  • Fire-escape riser≤ 180 mm

Trakhees §13.1.5 · §13.3.3

Landings
  • Clear width≥ stair clear width
  • Residential & office≥ 1 100 mm
  • Public buildings≥ 1 500 mm
  • At doors — inward swing≥ 900 mm deep
  • At doors — outward swing≥ 1 500 mm deep

Trakhees §13.1.4 · §13.1.17

What 14 steps actually buys — and doesn't

Fourteen risers at the 175 mm maximum carry you 2.45 m — well short of a typical UAE villa floor-to-floor of 3.3–3.6 m. A Trakhees main stair therefore breaks into two flights with a landing between them. The same stair on a mainland plot does not have to: DBC Part K requires no intermediate landing at any rise. And Trakhees' own fire-escape clause allows 20 consecutive steps — the 14 belongs to the main stair only. Quote the number with its regime, or the design conversation goes wrong from the first sketch.

Figure T·03 · Headroom & enclosure

2 400 mm — the strictest headroom in the UAE.

One hundred millimetres above the DBC. On a Trakhees plot, check every beam against this figure before clearing the section.

  • Minimum clear vertical height 2.4 m from the bottom margin of the landing finishes to the passageway — stricter than the DBC's 2 300 mm. The tight beam that clears on the mainland fails on the Palm. Trakhees §13.1.12
  • Main staircase in fire-resistant material — villas excepted. The exception is what makes the timber-and-glass villa stair legal on the Palm; in any other building type the main stair structure must be fire-resisting, with natural light and ventilation. Trakhees §13.1.13
  • The staircase must be approachable from any part of the building, farthest point not more than 30 m away. Trakhees §13.1.16
Figure T·04 · Curved & spiral stairs

The Blue Code's own wedge-tread rules.

Different measuring points from the DBC — 300 mm and 600 mm from the narrow end, not 305 — and a radius rule the DBC does not have.

Curved · Fig-42 · redrawn TREAD ≥ 280AT 300 FROM THE NARROW ENDSMALLEST RADIUS ≥ 2 × STAIR WIDTH ≥ 280 mm at 300 mm from the narrow end Smallest radius ≥ 2 × stair width · §13.1.9
Spiral · Fig-43 · redrawn TREAD ≥ 280AT 600 FROMTHE NARROW ENDRISER ≤ 180· HANDRAILS ON BOTH SIDES ≥ 280 mm at 600 mm from the narrow end Riser ≤ 180 · handrails on both sides · §13.1.10
Curved · §13.1.9
  • Tread at 300 mm from narrow end≥ 280 mm
  • Smallest radius≥ 2 × stair width

Trakhees §13.1.9 · Fig-42

Spiral · §13.1.10
  • Riser≤ 180 mm
  • Tread at 600 mm from narrow end≥ 280 mm
  • HandrailsBoth sides

Trakhees §13.1.10 · Fig-43

Winders: the Blue Code publishes no winder clause. A winder stair is judged under §13.1.4 (all steps identical) with the curved clause by analogy — and the reviewing engineer will usually apply DBC K.5.5.2.8 as well, since Trakhees also adopts the DBC. We assess against both and report the stricter.

Figure T·05 · Protective barriers

The 0.9 m clause — real, but never sufficient.

The Blue Code's barrier figure is the lowest number on this page, and it is the one number you should never design to.

  • Protective barrier on the empty side where the stair stands more than 1.0 m high: minimum height 0.9 m, clearance between vertical rods ≤ 125 mm, intermediate barrier where the stair is wider than 2.1 m. Trakhees §13.1.15
  • Superseded in practice — never design to 0.9 m. The UAE Fire & Life Safety Code and the DBC guard rules (1 065 mm with a combined handrail, otherwise 1 200 mm) also apply on Trakhees plots and govern the built result. We report §13.1.15 alongside them, never instead of them — a 900 mm balustrade will not survive review. DBC §K.5.5.2.6 · UAE FLSC
Regime III · Abu Dhabi

Yas, Saadiyat & the capital — ADIBC 2013.

AuthorityDMT / Abu Dhabi City Municipality — plus the master developer's design review (Aldar on Yas & Saadiyat, JIIC on Jubail)
CodeADIBC 2013 — the 2009 International Building Code with Abu Dhabi amendments. Stairs §1009 · handrails §1012 · guards §1013
WhereAbu Dhabi city & islands · Yas Island · Saadiyat · Jubail Island · Al Ain · Al Dhafra

A different code family entirely — imperial dimensions converted, IBC clause numbering, and a villa classified as Group R-3 whose dwelling exceptions govern most of our stairs. Fire & life safety remains the UAE FLSC, enforced by Abu Dhabi Civil Defence. One caution: Al Reem Island moved under ADGM jurisdiction in 2018 — confirm the approval path per project.

Figure A·01 · Step geometry — villa / Group R-3

The most permissive riser in the UAE — with strings attached.

The dwelling exception allows a 197 mm riser on a 254 mm tread — but demands a nosing where the tread runs shallow, and holds uniformity to the tightest tolerance of the three regimes.

ADIBC §1009.4.2 · redrawn TREAD ≥ 254RISER ≤ 197NOSING 19–32GROUP R-3 · DWELLING EXCEPTIONNOSING REQUIRED WHERE TREAD < 279UNIFORMITY ≤ 9.5 MM PER FLIGHT Riser ≤ 197 · tread ≥ 254 · nosing 19–32 Villa step profile, redrawn from ADIBC §1009.4.2, Exception 5
Riser & tread
  • Riser (dwelling exception)≤ 197 mm
  • Tread≥ 254 mm
  • Nosing — required where tread < 279 mm19–32 mm
  • Uniformity within a flight≤ 9.5 mm

ADIBC §1009.4.2 Exc. 5 · §1009.4.4

Width, rise & landings
  • Clear width (occupant load < 50)≥ 914 mm
  • Vertical rise per flight≤ 3 658 mm
  • Landing depth≥ width · min 914 mm
  • Top-of-flight landingWaived if no door swings over

ADIBC §1009.1 · §1009.5 · §1009.7

Profile & surface
  • Nosing projection — uniform≤ 32 mm
  • Nosing radius≤ 14.3 mm
  • Open risersPermitted — Ø 102 mm sphere
  • Surface slope≤ 2 %

ADIBC §1009.4.5 · §1009.6.1

The 3.66 m flight

ADIBC caps the vertical rise of a single flight at 3 658 mm — which a 3.5 m villa floor-to-floor fits inside. Like Dubai's Part K, an Abu Dhabi villa stair can therefore run floor to floor in one flight; unlike Dubai, the cap is explicit rather than open-ended.

Figure A·02 · Headroom

2 032 mm from the nosing line.

The lowest headroom minimum of the three regimes — but measured on the same nosing-line convention, continuous to one tread depth beyond the bottom riser.

ADIBC §1009.2 · redrawn NOSING LINEBEAM≥ 2 032MEASURED VERTICALLY FROM THE NOSING LINE — NOT TREAD TO SOFFITSPIRAL ≥ 1 981 · §1009.2 / §1009.9 ≥ 2 032 mm measured from the nosing line The convention that decides beam clearances — redrawn from ADIBC §1009.2
Stairways — general≥ 2 032 mm Measured vertically from the line connecting the nosings. §1009.2.
Spiral stairs≥ 1 981 mm Within dwelling units per §1009.9.
R-3 floor-opening projection≤ 121 mm Permitted intrusion of the floor structure into the required headroom in dwellings.
Figure A·03 · Winders, curved & spiral

Same walking-line logic, different numbers — and one different datum.

Abu Dhabi's walkline sits 305 mm from the narrow side, measured from the widest point of the clear stair width — not from the tread's edge. Compute it that way or the winder check comes out wrong.

ADIBC §1009.3 · redrawn WALKLINE · 305 FROM THE NARROW SIDE≥ 254 AT THE WALKLINE≥ 152 MINIMUM AT THE NARROW ENDDATUM: 305 SET OUT FROM THE WIDEST POINT OF THE CLEAR WIDTH · §1009.3 Walkline 305 mm from the narrow side ≥ 254 at the walkline · ≥ 152 minimum · set out from the widest point of the clear width
Winders — within a dwelling
  • Tread at the walkline≥ 254 mm
  • Tread minimum≥ 152 mm
  • Walkline from narrow side305 mm
  • DatumWidest point of clear width

ADIBC §1009.3 · §1009.4.2

Curved
  • Treads & risersPer §1009.4
  • Smallest radius ≥ 2 × widthWaived in R-3

ADIBC §1009.8

Spiral — within a dwelling
  • Tread at 305 mm point≥ 191 mm
  • Riser≤ 241 mm
  • Clear width≥ 660 mm
  • Headroom≥ 1 981 mm

ADIBC §1009.9

Winders in egress: not permitted in means-of-egress stairways except within a dwelling unit (§1009.4.3) — the villa interior is exactly the exception.

Figure A·04 · Handrails & guards

Lower guards, tighter spheres — the R-3 concessions.

The dwelling exceptions reach further here than anywhere else in the code — but the glass itself still answers to the UAE FLSC, exactly as in Dubai.

Handrails
  • Height above nosings — uniform864–965 mm
  • Circular profileØ 32–51 mm
  • Type I — perimeter102–160 mm
  • Largest cross-section≤ 57 mm

ADIBC §1012.2–.3

Guards
  • General≥ 1 067 mm
  • Dwelling stair flights — from nosing line≥ 864 mm
  • Sphere testØ 102 mm
  • Within dwellings — stair guardsØ 111 mm
  • GlassLaminated — Ch. 24 + UAE FLSC

ADIBC §1013.2–.3

Same stair, different verdict

A 184 mm riser fails DBC Part K in Dubai and passes ADIBC in Abu Dhabi. Winder minimums are 254/152 against Dubai's 280/150 — measured from a different datum. Headroom is 2 032 mm against 2 300 and 2 400. A guard on a villa flight may drop to 864 mm where Dubai holds 1 065–1 200. Never quote Dubai numbers on an Abu Dhabi drawing — or the reverse. It is the first thing we fix on relocated designs.

The wider picture

Codes & documents.

Geometry is only half of compliance. Every staircase and glass package also answers to a stack of codes covering fire & life safety, structural design, product conformity and sustainability. These are the governing documents, linked to their official sources.

Fire & life safety — the primary code
Building code & structural — Dubai
CoreDubai Municipality
Dubai Building Code (2021 edition)
Part K villas · Parts B/C/D other buildings · loads §K.8
The unified minimum design code for Dubai. Stair geometry, guards and safety glazing sit here or cross-reference the Fire Code. Regime I above is built on Part K.
Official source → dm.gov.ae
Trakhees · Blue Code
Trakhees Building Regulation Guidelines
PCFC areas · §13 vertical circulation
The code for PCFC areas — Palm Jumeirah, JAFZA, Dubai South / DWC and the ports. §13 carries the stair clauses behind Regime II above.
Open source → trakhees.ae
DDA · circular
DDA Circular 239 — Guardrails for Accessible Elevated Areas & Openable Windows
DC/HR/166/16 · 29 Sep 2016 · 1200 mm · 100 mm · 0.89 kN
DDA's own guardrail code — it names "an opening for a stairway" in its definition, so it applies to the guard around a duplex void in DDA districts. Matches the DBC except the climb-free zone; design to the stricter.
Open source → dda.gov.ae
Legal instrument
Decree No. 45 of 2021 — enacting the DBC
Legal basis · competent entities
The decree that gives the Dubai Building Code force of law and defines which authority licenses works in each area.
Open source → dubai.gov.ae
CAworksWorked example · PDF
Duplex stair in a DDA high-rise — governing regulations
20 clauses · DBC Parts A, B, E + DDA C239 · code pages reproduced
Our worked register for a stair inside a duplex apartment of a Dubai Hills tower: which clauses govern, which do not (Part K is out), and where DDA C239 and the DBC reconcile. The template we reuse on every high-rise fit-out.
Download → caworks
Building code & structural — Abu Dhabi
Product conformity & green building
Dubai Building Code 2021 — full PDF 843 pages · the binding reference for every DBC clause cited above. Official DM page · archive copy
↓ Download PDF · PCFC mirror
The shelf — every governing document in one place

Direct links to the current edition of each document cited on this page. Flipbook-only codes open at their stair chapter; everything else downloads as the authority publishes it.

Dubai Building Code — 2021 editionDM · 843 pp · Parts A / B / C / E / K
Decree No. 45 of 2021 — enacting the DBCLegal basis · applies emirate-wide incl. free zones
DM Decision No. 225 of 2024Amends some DBC construction parameters — check before issue
Trakhees Building Regulation & Design Guidelines ("Blue Code")PCFC areas · §13 Vertical Circulation
Dubai Universal Design CodeAccessible routes · §5.8 stairs · §5.9 handrails
DDA Circular 239 — Guardrails for Accessible Elevated AreasDC/HR/166/16 · 29 Sep 2016 · DDA districts
Abu Dhabi International Building Code — 2013DMT · stairs §1009 · handrails §1012 · guards §1013
Abu Dhabi International Accessibility StandardsDMT · ICC A117.1-based · accessible routes
UAE Fire & Life Safety Code — Façade, Glazing & RoofingCivil Defence · §2.17.6 glass in guards
CAworks — Duplex stair in a DDA high-rise: regulation registerWorked example · DBC Parts A / B / E + DDA C239 · 18 pp
Glass & balustrade

What the calculations run against.

The loading and product standards behind our engineering. The DBC adopts ASCE/SEI 7-16 for loads; the UAE Fire Code cites EN 12600, ANSI Z97.1 and 16 CFR 1202 directly; BS 6180 is our cross-check on barrier loads; the EN product standards define the laminated, toughened and heat-strengthened glass we specify. Paid standards link to their publishers.

LoadingAdopted by DBC K.8.4
ASCE/SEI 7-16 — Minimum Design Loads
Stair live loads · guard & handrail loads
The load basis the Dubai Building Code adopts for stairs and guards — assemblies must withstand its concentrated and uniform loads, with laminated glass holding in place if shattered.
Publisher → asce.org
LoadingBSI
BS 6180 — Barriers in and about buildings
Code of practice · barrier design loads
The horizontal line-load and infill-load cross-check we run alongside the ASCE values on every balustrade calculation.
Publisher → bsigroup.com
Cited by UAE codeBSI / CEN
BS EN 12600 — Pendulum impact classification
Safety-glazing impact test · class 1(B)1
The impact test and classification the Fire Code requires safety glazing to pass. Sets the safe-breakage rating on our glass.
Publisher → bsigroup.com
BSI / CEN
BS EN 14449 — Laminated & laminated safety glass
Product standard · interlayer
Conformity standard for the laminated glass mandated in structural balustrades. Governs the PVB / SGP interlayer build-up.
Publisher → bsigroup.com
BSI / CEN
BS EN 12150 — Thermally toughened safety glass
Product standard · fully tempered
Defines the fully-tempered plies used inside laminated balustrade panels and in shower / partition work.
Publisher → bsigroup.com
BSI / CEN
BS EN 1863 — Heat-strengthened glass
Product standard · heat-strengthened
The second permitted balustrade glass type under §2.17.6 — laminated heat-strengthened, for stronger post-breakage hold.
Publisher → bsigroup.com
ASTM
ANSI Z97.1 / ASTM — Safety glazing materials
US impact standard · listed by the FLSC
The American impact classification the Fire Code lists alongside EN 12600 for safety-glazing conformity.
Publisher → astm.org
CPSC · free
16 CFR 1201 — Architectural glazing safety
CPSC safety standard · Cat. I / II
The US federal architectural-glazing standard the Fire Code lists alongside EN 12600 — freely readable on eCFR. ADIBC Ch. 24 references Cat. II for glass in guards.
Open source → ecfr.gov
Who approves your project

It depends where you build.

Two things set your approval route: the building-control authority that issues the permit, and — in a managed community — the master-developer NOC that clears community and aesthetic guidelines. The authority also decides which regime above applies. The tables map the common cases.

Dubai
Where the project sitsBuilding-control authorityMaster-developer NOC
Mainland freehold / leasehold — Jumeirah, Al Barsha, Business Bay, Downtown, Deira Dubai Municipality · BPS Usually none
Meraas islands & districts — Pearl Jumeirah, Bluewaters, City Walk, La Mer, Port de la Mer Dubai Municipality · BPS Meraas
Emaar communities — Emirates Hills, Dubai Hills, Arabian Ranches, Dubai Marina Dubai Municipality · BPS Emaar
Palm Jumeirah Trakhees · CED Nakheel
Other Nakheel communities — Jumeirah Islands, Jumeirah Park, The Springs, Al Furjan Dubai Municipality · BPS Nakheel
Other developers — DAMAC Hills, Sobha Hartland, wasl & Dubai Properties communities Dubai Municipality · BPS DAMAC / Sobha / Wasl / Dubai Properties
Media & tech districts — d3, Dubai Media & Internet City, Knowledge Park, Production City Dubai Development Authority Per district
Free zones — JAFZA, Dubai World Central, JLT Trakhees / DMCC Per zone
Abu Dhabi
Where the project sitsBuilding-control authorityMaster-developer DRM
Abu Dhabi city and islands under municipal jurisdiction DMT · Abu Dhabi City Municipality —
Yas Island, Saadiyat, Al Raha and Aldar destinations DMT · ADM Aldar
Jubail Island DMT · ADM Jubail Island Investment Co. (LEAD)
Al Reem Island ADGM jurisdiction since 2018 Confirm per project
Al Ain · Al Dhafra DMT · regional municipality Per development
Constant across every row: Civil Defence fire & life-safety approval is always required — Dubai Civil Defence in Dubai, Abu Dhabi Civil Defence in Abu Dhabi — and the UAE Fire and Life Safety Code is the technical rulebook regardless of which authority processes the permit. The developer NOC never replaces the authority permit — it sits on top of it.
The approval path

From drawing to handover.

The typical route for a staircase / glass package inside a UAE submission. The CAworks tag marks our own touchpoints; the Varies tag marks the steps that change with location per the matrix above.

1
Design & engineering CAworks
Shop drawings + structural calculations

Staircase and balustrade detailed to the geometry regime for the plot — DBC Part K, Trakhees §13 or ADIBC §1009 — and to UAE Fire Code §2.17.6, with loads run to ASCE/SEI 7-16 and BS 6180 and glass verified to EN 12600. Output: stamped drawings and calcs.

2
Consultant coordination
Consultant / main-contractor review

The engineering consultant reviews the package and folds the staircase and glass into the overall building design submission.

3
Master developer Varies
Community NOC / DRM — if in a managed community

Where the plot sits in a developer-managed community, the master-developer review (Emaar, Nakheel, Meraas, DAMAC in Dubai; Aldar or JIIC design review in Abu Dhabi) clears community guidelines before the authority permit. A plain mainland plot skips this. See the matrix above.

4
Building-control authority Varies
Building permit — DM, Trakhees, DDA or DMT

The consultant submits to the authority for the location — Dubai Municipality's BPS for the mainland, Trakhees for the Palm and PCFC free zones, the DDA for media / tech districts, or DMT / ADM in Abu Dhabi under the ADIBC — with the UAE Fire Code cross-referenced.

5
Civil Defence
Fire & life-safety design approval

Civil Defence — DCD in Dubai, ADCD in Abu Dhabi — reviews the life-safety drawings, including glazing and guards, and issues preliminary approval before installation begins. Applies to every location.

6
Conformity
Material & product certification

Glass and fire-safety materials confirmed as ECAS-certified and Civil-Defence listed, with product data and test certificates ready for inspection.

7
Fabrication & install CAworks
Fabricate, install & inspect

Manufactured and installed to the approved drawings, followed by Civil Defence and authority / consultant site inspection against the sign-off package.

8
Completion
Civil Defence certificate → Building Completion Certificate

Civil Defence issues its completion certificate; the authority then issues the Building Completion Certificate — the gate to legal handover and occupancy.

Common questions

The questions we get most.

Does the 14-step / landing rule apply to my villa?

It depends on the plot. Under DBC Part K — mainland Dubai villas — no intermediate landing is required regardless of floor-to-floor height; a 19-riser flight is compliant. Under Trakhees — the Palm, JAFZA, Dubai South — the main stair is capped at 14 steps in one direction, so the same stair needs a landing. In Abu Dhabi the cap is expressed as vertical rise: up to 3.66 m per flight. Which regime governs is decided by the building-control authority for your plot — see the matrix above.

Do the Dubai numbers apply to my Yas Island or Jubail Island villa?

No. Abu Dhabi runs on the ADIBC 2013 — different limits, different clause numbering, and a Group R-3 dwelling classification whose exceptions govern villa stairs. A 184 mm riser fails in Dubai and passes in Abu Dhabi; winder and headroom minimums differ too. Use the Abu Dhabi section above, and expect the master developer's design review (Aldar, JIIC) on top of the DMT permit.

My existing stair void cannot fit a compliant stair — what are my options?

The DBC has a formal route: clause A.8 permits performance-based alternative solutions where the prescribed requirements cannot reasonably be met, or where compliance in an existing building would cost disproportionately. The consultant demonstrates equivalence and the Authority decides. Note that a design approved before the DBC is only exempt as built — a replacement staircase is a change, assessed under A.8(b). We prepare the geometry and comparable-standard evidence for that argument; it is a documented, workable path.

Does a residential villa in Dubai have to follow the UAE Fire and Life Safety Code?

Yes. The code applies to all building types, private villas included. Dubai Civil Defence enforces it, and its completion certificate is required before the authority issues the Building Completion Certificate. Villas are lighter than towers on active systems like sprinklers, but the passive rules — guard height, the sphere rule, and the laminated-glass requirement — are not waived.

Does a glass staircase barrier have to be laminated glass?

Yes. Under §2.17.6, structural balustrade panels must be laminated fully-tempered glass with a structural interlayer, or laminated heat-strengthened glass. Monolithic toughened glass on its own is not accepted for a structural barrier, because it disappears when it breaks and removes the barrier at the moment of failure. The same outcome applies in Abu Dhabi via ADIBC Chapter 24 and the FLSC.

Is it the UAE Fire Code or DDA that I have to comply with?

Not either/or. The UAE Fire and Life Safety Code is the technical rulebook; DDA, Dubai Municipality, Trakhees and DMT are authorities that enforce it within their areas. Complying with your authority means complying with the code.

Who approves my project — the municipality, Trakhees or the master developer?

It depends on location. Building-control is Dubai Municipality for mainland plots, Trakhees for designated free zones such as the Palm, the DDA for media and tech districts, or DMT / ADM in Abu Dhabi. Most managed communities also require a master-developer NOC or design review from Emaar, Nakheel, Meraas, DAMAC, Aldar and others. Civil Defence approval applies everywhere. The tables above map the common cases.

Can I use toughened glass instead of laminated to save cost?

Not for a structural balustrade panel under the UAE code. Laminated glass holds together after breakage; toughened glass does not. Monolithic infill is only permitted where a compliant continuous top rail carries the load independently of the glass.

Designing a staircase or glass barrier? We handle the code compliance as part of the engineering — stamped drawings, laminated glass certified to the UAE Fire Code, and the submission pack your consultant and Civil Defence need, in whichever emirate the project sits.
Talk to our engineering team →

Provided for general information, current as of August 2026, and not a substitute for project-specific engineering or legal advice. Code editions in force confirmed August 2026 — verify with the relevant authority before submitting. International standards (BS · EN · ASTM · ANSI · ASCE) are the property of their publishers. Jurisdictions shown are Dubai and Abu Dhabi; other emirates apply local rules over the same UAE federal Fire Code.